On August 12, Jinggong automobile (Rizhao) chassis automation line of great wall (Weiyi) automobile Rizhao production base project was started. This means that the Rizhao production base of great wall (Weiyi) automobile is one step closer to the vehicle offline.
According to the data, on March 18 this year, four parts projects of Great Wall Motors Rizhao Weiyi started construction. The total investment is 1.3 billion yuan! The construction of four parts and components projects of Great Wall Motors Rizhao Weiyi starts! The total investment of the project is 1.3 billion yuan. Four production workshops of chassis, interior decoration, exterior decoration and seats will be built and put into operation simultaneously with Rizhao Weiyi vehicle project. The project is invested and constructed by Baoding Great Wall Industrial Co., Ltd., a subsidiary of Great Wall Holding Group Co., Ltd., and is produced and operated by the independent brand parts company of Great Wall Motor Co., Ltd., which marks that the Great Wall Rizhao Weiyi automobile industrial park has begun to take shape. After the project is completed, the annual business income will be about 4 billion yuan, and the profits and taxes will be 700 million yuan.
Jingcheng engineering automobile parts (Rizhao) Co., Ltd. is a wholly-owned subsidiary of Jingcheng engineering automobile System Co., Ltd., which was established in January 2020. It is located in Rizhao Economic and Technological Development Zone, Shandong Province, with a total investment of 470 million yuan. The project covers an area of about 60 mu, mainly including four workshops: stamping workshop, welding workshop, electrophoresis workshop and assembly workshop. The planned annual production capacity is 300000 sets, undertaking the Great Wall (Weiyi) The production task of various core parts such as chassis and body stamping and welding parts in Rizhao automobile production base.
The Great Wall Rizhao Weiyi automobile project is the largest automobile industry project introduced in the city so far, and Rizhao Development Zone has built a complete automobile industry chain. With a total investment of 15 billion yuan, the project will build four major process workshops of stamping, welding, painting and general assembly, as well as parts and components factories for punching and welding parts suspension assembly, interior decoration, exterior decoration, seats, wiring harness, air conditioning, lamps, etc., and supporting the construction of auxiliary facilities such as test track and finished product warehouse, mainly producing the high-end brand wey series of great wall motor. The final assembly workshop is behind other processes, including two production lines for punching and welding parts suspension assembly, interior decoration and assembly, and three auxiliary lines for door, instrument and engine. It is the last process for assembling more than 1000 kinds of automobile parts and realizing the vehicle offline. Today, the main body of press equipment A01 in stamping workshop is completed.
The Rizhao production base of great wall (Weiyi) automobile has a total investment of 15 billion yuan. It mainly produces weiy, a high-end brand of Great Wall Motor, with an annual production capacity of 300000 vehicles. It is expected that the whole vehicle will be offline before New Year’s day. It is reported that since the construction in September last year, the Great Wall Weiyi project has constantly updated the construction speed. Up to now, the main parts of stamping, welding, coating and general assembly workshops of the project have been completed. It is expected that all the equipment in the four workshops can be installed in October. The supporting parts project will enter the installation stage after the automation line body of Seiko automobile chassis enters the factory.
2020-10-17